solve the problem...
Attachments:
Answers
Answered by
1
Time taken :
A = (1+60%)(A+B)
=1.6 (A+B)
A:(A+B) = 1.6 =5:3
B+C = 13 1/3 days
Efficiency :
A+B :A = 5:3
3 *(A+B)=5A
3B =2A
A:B =3:2
C =2B
let work done by B in one day = 1/b
then work done by C = 2/b
work done by B+C in one day = 1/(13 1/3) = 3/40
1/b +2/b = 3/40
3/b = 3/40
2/b= 1/c = 2/40 =1/20
c = 20 days
b =40 days
B takes 40 days to finish the work, so A takes 3/5×40 = 24 days
work done by A+B in one day
=1/24 +1/40 = 5+3/120 =8/120 =1/15
A+B takes 15 days