Business Studies, asked by Ajeet332, 11 months ago

Stress distribution in sheeting and bracing of shallow foundation

Answers

Answered by Anonymous
0

Answer:

Each tie back is generally prestressed the depth of excavation is increased further to cope with the increased tension. ... .

The slurry stabilizes the walls of the trench, and thus the excavation can be done without sheeting and bracing. Concrete is then placed through a tremie. Concrete displaces the slurry.

Similar questions