the area of playground is 4800m square .find the cost of covering it with gravel 1 cm deep,if the gravel costs Rs.4.80 per cubic meter
Answers
Answered by
100
sollution:
1 cm = 0.01m
total cubic meter to fill with gravel = 0.01*4800
= 48
therefore total cost = 48*4.80
=230.4
1 cm = 0.01m
total cubic meter to fill with gravel = 0.01*4800
= 48
therefore total cost = 48*4.80
=230.4
Answered by
75
We know that 1cm = 0.01m.
The volume is given by 4800 * 0.01
= 48 cubic meters.
Costing = 48 * 4.80
= 230.4
Hope this helps!
The volume is given by 4800 * 0.01
= 48 cubic meters.
Costing = 48 * 4.80
= 230.4
Hope this helps!
Similar questions