The cost of production of set rupees 900 divided between material labour and overheads in the ratio 3 : 4 : 2 calculate the cost of material used in the ,ratio set
Answers
Answered by
0
Answer:
300 is of material
400 is of labour
200 is of over heads
Explanation:
ratio is 3:4:2
there would be a same constant let it be x
the ratio is 3x:4x:2x
3x+4x+2x=900
9x=900
x=100
material used is 3x
3×100=300
therefore cost is 300