Math, asked by vyankateshkulkarni, 11 months ago

The output of a production line is checked by an inspector for one or more of three differenttypes of defects, called defects A, B and C. If defect A occurs, the item is scrapped . If defectB or C occurs, the item must be reworked. The time required to rework a B defect is 15minutes and the time required to rework a C defect is 30 minutes. The probabilities of anA, B and C defects are .1 5, .20 and .10 respectively. For ten items coming off the assembly line, determine tile number of items without any defects, the number scrapped and the total minutes of rework time. Use the following random numbers,

Answers

Answered by shabeeltve
0

Answer:

where are the random numbers

Step-by-step explanation:

Answered by AditiHegde
4

The complete data is:

For ten items coming off the assembly line, determine tile number of items without any defects, the number scrapped and the total minutes of rework time. Use the following random numbers,

RN for defects A:  

48 55 91 40 93 01 83 63 47 52  

RN for defects B:  

47 36 57 04 79 55 10 13 57 09  

RN for defects C:  

82 95 18 96 20 84 56 11 52 03

Now consider,

Probability distribution (Defect A)  

Event Prob. Cume. Prob. Prob. range Prob. range for simulation  

Defect 0.15 0.15 0-0.15 0-0.14  

No defect 0.85 1.00 0.15-1.00 0.15-0.99  

Probability distribution (Defect B)  

Event Prob. Cume. Prob. Prob. range Prob. range for simulation  

Defect 0.20 0.20 0-0.20 0-0.19  

No defect 0.80 1.00 0.20-1.00 0.20-0.99  

Probability distribution (Defect C)  

Event Prob. Cume. Prob. Prob. range Prob. range for simulation  

Defect 0.10 0.10 0-0.10 0-0.09  

No defect 0.90 1.00 0.10-1.00 0.10-0.99  

Item Defect A Defect B Defect C Rework time  

1 No No No  

2 No No No  

3 No No No  

4 No Yes No 15 m

5 No No No

6 Yes No No

7 No Yes No 15 m

8 No Yes No 15 m

9 No No No  

10 No Yes Yes 15m + 30m  

                90m  

No. of defect items : 5  

Scrap : 1 (Item No. 6)  

Rework : 4