The reduced levels of points, 30 metres apart
along the longitudinal section of a road por-
tion between chainages 5 and 9 are shown in
the given figure. If there is a uniform up-gradi-
ent of the road 120 in 1, the chainage of the
point with no filling or cutting is
Formation
1035 m
103.0 m
102.0 m
/ mc 100.0 m
101.0
9925 m
7
8
7
5
Answers
Answered by
0
Answer:
advertisement of the Colgate in English
Answered by
0
Answer:
(6+12)chains