The standard hourly rate was 1.40, the actual rate 1.30, the labour rate variance was Rs. 600 favourable. The actual hour were
Answers
Answered by
1
Answer:
6000
Explanation:
let actual hour = x
x ( 1.4-1.3) = 600
x = 6000 hour