The work done to pull a basket of water of capacity 10litre from a well of depth 4m is=
Answers
Answered by
0
Answer:
I think this is the answer
Explanation:
Work done by the person is the change in potential energy of the bucket and the rope.
Given, the rope has a uniform mass m. So the center of mass for the rope is at half of the length of the rope.
So, it will be at a distance h/2 from the bottom.
Work done = Change in PE of bucket+Change in PE of rope
W=Mgh+mg
2
h
=(M+
2
m
)gh
hope this helps you
Answered by
0
This Could Be Correct Answer.
Similar questions