Math, asked by iampritam, 10 months ago

water is pouring into a cuboidal Reservoir @ 60 litres per minute if the volume of reserva is 108 meter cube find the number of hours it will take to fill the reserver if the area of the base of cube is 24 metre cube find the height of the cuboid ​

Answers

Answered by rams33396
2

Answer:

water is poured at the rate of 60 litre per minute

Attachments:
Similar questions