When performing a Use Case point's estimation, you estimate the number of Use Case Points at 500 UCP. The benchmark productivity for the software development lifecycle in that technology is 0.5 UCP per person-day What would be the estimated effort for that project only for the software development life cycle?

Select one:

a. 250 person-days

b. 500 person-days

c. None of the other answers is correct

d. 1000 person-days​

Answers

Answered by kulkarninishant346
2

Answer:

A Use-Case is a series of related interactions between a user and a system that enables the user to achieve a goal.

Use-Cases are a way to capture functional requirements of a system. The user of the system is referred to as an ‘Actor’. Use-Cases are fundamentally in text form.

Use-Case Points – Definition

Use-Case Points (UCP) is a software estimation technique used to measure the software size with use cases. The concept of UCP is similar to FPs.

The number of UCPs in a project is based on the following −

The number and complexity of the use cases in the system.

The number and complexity of the actors on the system.

Various non-functional requirements (such as portability, performance, maintainability) that are not written as use cases.

The environment in which the project will be developed (such as the language, the team’s motivation, etc.

Answered by Anonymous