English, asked by kesue, 11 months ago

(Which of the following is correct with reference to thermal power projects?

Answers

Answered by bestanswers
0

Answer:

The answer is Option D.  Kawas Power plant at Gujarat.

Explanation:

The Kawas gas-based power plant is located in 568 acres of land in the Surat district of Gujarat,India. The Kawas Power plant is operational since 1992. The Stage I of Kawas power plant has four gas turbines and two steam turbines, with a total installed capacity of 645 MW.  The stage II o fthe Kawas power plant has a capacity of CCPP by 1,300 MW.The power generated from the plant is fed to the Western Grid of India through four 220kV double circuit transmission lines.

Answered by PBCHEM
0

Answer:

Only the fourth option is correct.

Kawas Thermal power station is in Gujarat. All other options are wrong.  Korba is in Chhattisgarh and not Uttar Pradesh. Ramgundam is in Telegana and not is Tamilnadu. Again Talcher Thermal Power Plant is in Orissa and not in Andhra Pradesh. Therefore except the choice 4 all are incorrect.

Similar questions