Physics, asked by unnushewale29, 2 months ago

Which precautions we should take while performing Kelvin's method?​

Answers

Answered by djtigerking75
2

Answer:

i) Clean the connecting wires and the connecting points of metre bridge properly with sand paper. (ii) All connections should be neat and tight. (iii) Balance point should lie between 30 cm and 70 cm. (iv) Do not keep the jockey and the wire in contact for a long time.

Answered by Itzpureindian
1

Clean the connecting wires and the connecting points of metre bridge properly with sand paper. (ii) All connections should be neat and tight. (iii) Balance point should lie between 30 cm and 70 cm. (iv) Do not keep the jockey and the wire in contact for a long time.

Similar questions