Why is average cost curve is also called planning curve?

Answers

Answered by puzzle2412
0

formula of average cost curve :

= products/number of production units

so if we get average cost then we can plan the situation

Answered by sanjanajaiswal634
0

A long run average cost curve is known as a planning curve. This is because a firm plans to produce an output in the long run by choosing a plant on the long run average cost curve corresponding to the output.