Why is average cost curve is also called planning curve?
Answers
Answered by
0
formula of average cost curve :
= products/number of production units
so if we get average cost then we can plan the situation
Answered by
0
A long run average cost curve is known as a planning curve. This is because a firm plans to produce an output in the long run by choosing a plant on the long run average cost curve corresponding to the output.