Accountancy, asked by rajputdivyanking, 5 hours ago

Work cost is the total of
(a) direct cost
(b) indirect cost
(c) variable cost
(d) controllable cost
(e) uncontrollable cost

Answers

Answered by farhasayed44
1

Answer:

direct cost is the right answer

Answered by varshadeshmukh876
0

Answer:

(c) variable cost

work cost is the total of variable cost

Similar questions