Work cost is the total of
(a) direct cost
(b) indirect cost
(c) variable cost
(d) controllable cost
(e) uncontrollable cost
Answers
Answered by
1
Answer:
direct cost is the right answer
Answered by
0
Answer:
(c) variable cost
work cost is the total of variable cost