2. 7 men and 8 boys can do a piece of work in
2 days. 4 men and 12 boys can do of the
same work in 1 day. In how many days will
1 man do this work?
Answers
Answered by
0
Answer:
Step-by-step explanation:
men => x & boys => y
ATQ,
7/x + 8/y = 1/2
4/x + 12/y = 1/1
Let 1/x = a & 1/y = b
7a + 8b = 1/2
4a + 12b = 1/1
14a + 16b = 1
4a + 12b = 1
56a + 64b = 4
56a +168b = 14
- - -
_________________
- 104b = -10
b = 10/104 = 5/ 52
1/y = 10/104
y = 104/10 = 10.4
solve for x. i ran out of time sorry. :(