A man can do a piece of work in 20 days.
(i) How much work does he do in 1 day?
(ii) How much work does he do in 5 days?
(iii) If he leaves the work after 10 days, how much work is left to do?
Answers
Answered by
0
Answer:
for 1 5 percent and for 2 25 percent
Answered by
1
Answer:
(i) he does 5% work in 1 day.
(ii) he does 25 % work in 5 day.
(iii) If he leaves the work after 10 days 50% work is left to do