a repair job took 4 h and 15 min and required $390 in parts. what is the total cost
Answers
Answer:
h = 2.5
Step-by-step explanation:
note that, if you multiply a rate by the time, you'll get the fee for that amount of time.
He worked 3 regular hours at $30 per hour, so he would charge 3.30 or $90 for the regular work.
He worked h overtime hours at $42 per hours, so he would charge h-42 or $42h for the overtime work.
The total fee of $390 is the sum of the regular hours, the overtime hours, and the cost of the parts, so we add those there amounts and set them equal to the total.
0 + 42h + 195 = 390 .
42h + 285 = 390
42h = 105
h = 2.5
Given: The linear function f(t)= 30+60t. A repair job took 4 h and 15 min and required $390 in parts.
To find: The total cost.
Solution: The total cost is Rs. 285.
The linear function given in the question is written as follows.
Here, t is the time that had been taken for the repair job to be completed. The time 4 hours and 15 minutes can be written as follows
Now, the value of t can be substituted in the linear function and the total cost of the repair job can be calculated.
Therefore, the total cost is Rs. 285.
Although part of your question is missing, you might be referring to this full question:
The linear function f(t)= 30+60t. A repair job took 4 hr and 15 min and required $390 in parts? What is the total cost?