A train of length 150 m took 8 sec to cross a bridge of length 250m. Time taken by the train to cross a telephone post is
Answers
Answered by
12
Answer:
Time taken by the train to cross a telephone post is 3 sec
Step-by-step explanation:
A train of length 150 m took 8 sec to cross a bridge of length 250m.
Train Length = 150 m
Bridge length = 250 m
Distance covered by train to cross bridge = Train Length + Bridge length
= 150 + 250
= 400m
Time taken = 8 sec
Speed of train = Distance /Time = 400/8 = 50 m/s
Distance to be covered to cross telephone post = Train Length
= 150 m
Time required = 150/50 = 3 sec
Time taken by the train to cross a telephone post is 3 sec
Similar questions