Two basic methods of applying shotcrete are dry mix process and wet mix process. The term gunite is frequently used when referring to the dry-mix method; other terms such as air-placed concrete, gunned concrete and sprayed concrete have also been used in the past to describe the process.



#Dry mix process shotcrete
In this process, the wet cement and aggregate are mixed and then placed in a device that meters the mixed material into the compressed air stream. The material is compressed air through a delivery hose to the water under pressure through a nozzle ring plus porous carrier. The water thoroughly wets the other ingredients as the mixture is jetted from the nozzle at high velocity onto the surface to be shotcreted.




#Wet mix process shotcrete
In the wet mixing process, all the ingredients are first mixed to produce mortar or concrete. Then the mortar or concrete is placed into the delivery device. The material through the delivery hose to a compressed air is injected to increase the speed of the nozzle forcibly.
Similar questions