material control is related to the control on material things
and labour control is the control over laboures
and labour control is the control over laboures
Answered by
0
The main difference between material control and labor control is that material control deals with purchasing and consumption of of materials and inventory.
Labor control deals with effectively managing the labor for getting maximum benefits from them keeping the cost factor in mind
Explanation:
Material control
- Materials control refers to to buying, using and consuming of the materials in regards to raw materials for production.
- There is a systematic method of procuring the materials so as to reduce wastage and losses
- Material control entails the getting of good quality of materials at the right time and rights costs
Labor control
- Labor control refers to getting maximum benefits from effective utilization of labor services
- Labor control involves certain costs involved with the service of the workers through their efficiency.
- It is necessary to identify the the jobs and processes with the cost involved for manufacturing of the product since it is included in the price of the product