Distinguish between route card and route sheet
Answers
Answered by
2
In order to track a specific set of steps or a sequence in the manufacturing process, a routesheet is used to note a number of things. Route sheets identify and number a work order, and generally include a symbol or another concrete way to identify a part. The number of pieces in each production lot is estimated and recorded, as is the total number of pieces to be produced. The procedures and sequence of each operation on a given part is noted. All of the machines and necessary equipment to perform the operation are listed on a route sheet. Finally, you would find that a prediction of set-up andproduction time for each piece would be included.Route sheets can be applied in different ways. They may be used as planning tools, and for quality control purposes. When used as planning tools, a routing sheet may be used by different departments as theyset up the step by step production of an item. Different supervisors and managers are able to monitor progress, production time, equipment use, and operator history throughout the production process using the routing sheet.Therefore, a route sheet can be used during planning, production, monitoring, and quality control for an item or items during the manufacturing process.
Similar questions