find the cost of digging a cuboidal pit 8 metre long 6 metre board and 3 metre deep @ rupees 30 per metre cube
Answers
Answered by
5
Answer:
Step-by-step explanation:
Attachments:
Answered by
2
The cost of digging cuboidal pit is Rs. 4320.
Step-by-step explanation:
Let the length of the cuboidal pit = L = 8m
Breadth of the cuboidal pit = B = 6m
Depth of the cuboidal pit = H = 3m
Volume = L x B x H = 8 x 6 x 3 m³ = 144 m³
Cost of digging per m³ = Rs. 30
Cost of digging 144 m³ = Rs. 30 x 144 = Rs. 4320
Hence, the cost of digging cuboidal pit is Rs. 4320.
Similar questions