how much work is done in moving a charge of 2 column across two points having a potential difference 12V
Answers
Answered by
4
work done/charge is eual potential diff.so
work done -charge *potential diff.
-2*12 is equal 24 joule
Explanation:
answer is 24 joule.Mark as brainlist if helped nd follow for future help
Anonymous:
thq so much
Answered by
17
The amount of charge Q, that flows between two points at potential difference V (= 12V) is 2C. Thus, the amount of work W, done in moving the charge is
W = VQ
= 12V × 2C
= 24J
Similar questions