if 35 men can do a work in 8 days .how many men could do the same work in 10 days.

Answers

Answered by Rumi123456789
3
In 8 days, number of men required = 35
In 10 days, number of men required = (35/10)×8
= 3.5×8 = 28 men

2007shoaibpb0hbc: 8days = 35men
2007shoaibpb0hbc: 1 day = 35*8 so 10 days = 35*8/10 = 28men
Answered by karn89
0
35.8=1
35=1/8
35.8/10=x
28=x
28 men

Nakul3602: answer is 44men