If 9 trucks can be loaded by workers in
Attachments:
Answers
Answered by
15
=> Time taken to load 9 trucks = = hrs
=> Time taken to load 1 truck = = hrs
=> Time taken to load 4 trucks = × 4 = 3 hrs.