if the daily product rate of a crew that work in an activity is 173 meter cub per day and total crew cost per day is 1800 dollar . the material needed for daily work is 4.5 meter cube at 100 dollar per meter cube
a) calculate the time and cost it take the crew to finish 1400 meter cube
b)calculate the total unit cost
Answers
Answered by
2
Answer:
if the daily product rate of a crew that work in an activity is 173 meter cub per day and total crew cost per day is 1800 dollar . the material needed for daily work is 4.5 meter cube at 100 dollar per meter cube
a) calculate the time and cost it take the crew to finish 1400 meter cube
b)calculate the total unit cost
Answered by
1
Answer:
__________________________---------