Mention any four limitations in harnessing wind energyon alarge scale.
Answers
Answered by
1
farm is high 3. availability of land as per the requirements i.e. large lands in hilly regions with high speed wind.
needs a lot of area for set up. It need high level of maintenance. It can Only be sed up in places with wind speed 15km per hour. It can only be set up in hilly terrain.
needs a lot of area for set up. It need high level of maintenance. It can Only be sed up in places with wind speed 15km per hour. It can only be set up in hilly terrain.
Similar questions