OBJECTIVE PHYSICS IA
A bucket filled with water weighing 20 kg is raised from a well of depth 20m. If the linear density of
the rope is 0.2kg per meter, the amount of work done is, (g = 10ms) (in J)
Answers
Answered by
1
Answer:
Work done = q * potential difference
q = linear charge density *length.
Put values...
Hope it works out....
Answered by
6
Weight of bucket + Rope of length x=m=20+0.2x
Work done in raising the rope+bucket by depth dx=dW=mg(dx)
Integrating both sides from x=0m to x=20m
⇒W=∫²⁰
(20+0.2x)(10)(dx)
⇒W=4000+400=4400J
Similar questions