what is the cost of tiling a rectangular plot of 500 m and 200m at 8rs per hundred sqm
Mrunal23:
is it correct
Answers
Answered by
2
500×200=100000sq.m
1 sqm=8₹
100000=800000₹
Answered by
6
given
A rectangular plot
length=500m
breadth=200m
Area = l×b
=500×200m
=1,00,000m²
now cost is rs8 per 100m²
so total cost=1,00,000÷100×8
=1,000×8
=rs8,000ANS:
A rectangular plot
length=500m
breadth=200m
Area = l×b
=500×200m
=1,00,000m²
now cost is rs8 per 100m²
so total cost=1,00,000÷100×8
=1,000×8
=rs8,000ANS:
Similar questions