why The development length for the top bars in a Reinforced Concrete element with depth more than 300mm is greater than that for the bottom bars.
Answers
Answered by
1
Answer:
Explanation:
The reason is because the development length of the two bars in Reinforced concrete element is more than that of the bottom bars.
Similar questions